Cost Breakdown
Name/Model: Bushwacker BSW-L1m
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (184 pts) 11.5 x 10,000 115,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 203,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 313,000.00
Engine (Light Fusion): (15,000 x 275 x 55) / 75 (+) 3,025,000.00 = 3,338,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,238,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,438,000.00
Life Support: 50,000 (+) 50,000.00 = 4,488,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 4,598,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 4,658,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 11,000.00 = 4,669,000.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 4,707,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,707,500.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Large Laser 200,000 (+) 200,000.00 = 250,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 850,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 850,000.00
Small Laser 11,250 (+) 11,250.00 = 861,250.00
Small Laser 11,250 (+) 11,250.00 = 872,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 872,500.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,707,500.00
Weapons and Equipment Cost: (+) 872,500.00 = 5,580,000.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 8,649,000.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 8,649,000.00
|