Cost Breakdown
Name/Model: CPPnator NATOR-01
Technology: Inner Sphere
Tonnage: 85
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (263 pts) 16.5 x 10,000 165,000.00
Internal Structure (Standard): 85 x 400 x 1 (+) 34,000.00 = 199,000.00
Myomer (Standard): 85 x 2,000 (+) 170,000.00 = 369,000.00
Engine (Fusion): (5,000 x 255 x 85) / 75 (+) 1,445,000.00 = 1,814,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,714,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,914,000.00
Life Support: 50,000 (+) 50,000.00 = 2,964,000.00
Sensors: 85 x 2,000 (+) 170,000.00 = 3,134,000.00
Heat Sinks (Double): 20 x 6,000 (+) 120,000.00 = 3,254,000.00
Arm Actuators: 85 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 17,000.00 = 3,271,000.00
Leg Actuators: 85 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 59,500.00 = 3,330,500.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,330,500.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Jump Jets 85 x (3 x 3) x 200 153,000.00
PPC 200,000 (+) 200,000.00 = 353,000.00
PPC 200,000 (+) 200,000.00 = 553,000.00
PPC 200,000 (+) 200,000.00 = 753,000.00
PPC 200,000 (+) 200,000.00 = 953,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 953,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,330,500.00
Weapons and Equipment Cost: (+) 953,000.00 = 4,283,500.00
BattleMech Cost Multiplier: 1 + (85 / 100) (*) 1.85 = 7,924,475.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 7,924,475.00
|