Cost Breakdown
Name/Model: Firefly II FFL-8A II-lppc
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (112 pts) 7.0 x 10,000 70,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 126,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 196,000.00
Engine (Fusion): (5,000 x 175 x 35) / 75 (+) 408,333.33 = 604,333.33
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,204,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 1,404,333.33
Life Support: 50,000 (+) 50,000.00 = 1,454,333.33
Sensors: 35 x 2,000 (+) 70,000.00 = 1,524,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 1,584,333.33
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 16,100.00 = 1,600,433.33
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 1,624,933.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,624,933.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 130,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 210,000.00
ER Small Laser 11,250 (+) 11,250.00 = 221,250.00
ER Small Laser 11,250 (+) 11,250.00 = 232,500.00
Jump Jets 35 x (5 x 5) x 200 (+) 175,000.00 = 407,500.00
Light PPC 150,000 (+) 150,000.00 = 557,500.00
LRM 5 30,000 (+) 30,000.00 = 587,500.00
LRM 5 30,000 (+) 30,000.00 = 617,500.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 617,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 617,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,624,933.33
Weapons and Equipment Cost: (+) 617,500.00 = 2,242,433.33
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 3,027,285.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 3,027,285.00
|