Cost Breakdown
Name/Model: SUNDER II (SD2-X) [BASE]
Technology: Inner Sphere (Mixed)
Tonnage: 90
Configuration: Biped OmniMech
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (279 pts) 17.5 x 10,000 175,000.00
Internal Structure (Endo-Composite): 90 x 3,200 x 1 (+) 288,000.00 = 463,000.00
Myomer (Triple-Strength): 90 x 16,000 (+) 1,440,000.00 = 1,903,000.00
Engine (Light Fusion): (15,000 x 270 x 90) / 75 (+) 4,860,000.00 = 6,763,000.00
Gyro (Compact): 4.5 x 400,000 (+) 1,800,000.00 = 8,563,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,763,000.00
Life Support: 50,000 (+) 50,000.00 = 8,813,000.00
Sensors: 90 x 2,000 (+) 180,000.00 = 8,993,000.00
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 9,089,000.00
Arm Actuators: 90 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 18,000.00 = 9,107,000.00
Leg Actuators: 90 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 63,000.00 = 9,170,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,170,000.00
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
Heavy PPC 250,000 250,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 500,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 750,000.00
PPC Capacitor 150,000 (+) 150,000.00 = 900,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,200,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,500,000.00
Supercharger (Armored) 270 x 10,000 + (1 x 150,000) (+) 2,850,000.00 = 4,350,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 4,350,000.00
=========================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,170,000.00
Weapons and Equipment Cost: (+) 4,350,000.00 = 13,520,000.00
OmniMech Conversion Cost: (9,170,000.00 + 4,350,000.00) x 0.25 (+) 3,380,000.00 = 16,900,000.00
BattleMech Cost Multiplier: 1 + (90 / 100) (*) 1.90 = 32,110,000.00
-------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 32,110,000.00
|