Cost Breakdown
Name/Model: Victor
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (199 pts) 12.5 x 10,000 125,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 253,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 413,000.00
Engine (XL): (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 7,239,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 8,439,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,639,666.67
Life Support: 50,000 (+) 50,000.00 = 8,689,666.67
Sensors: 80 x 2,000 (+) 160,000.00 = 8,849,666.67
Heat Sinks (Double): 14 x 6,000 (+) 84,000.00 = 8,933,666.67
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 30,400.00 = 8,964,066.67
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 9,020,066.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,020,066.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Jump Jets 80 x (4 x 4) x 200 256,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 431,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 606,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,006,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,006,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,006,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 1,126,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 1,246,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,246,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,246,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,020,066.67
Weapons and Equipment Cost: (+) 1,246,000.00 = 10,266,066.67
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 18,478,920.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,478,920.00
|