Cost Breakdown
Name/Model: Marauder MAD-3RX
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (216 pts) 13.5 x 10,000 135,000.00
Internal Structure (Endo-Composite): 75 x 3,200 x 1 (+) 240,000.00 = 375,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 525,000.00
Engine (XL): (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 6,525,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 7,425,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,625,000.00
Life Support: 50,000 (+) 50,000.00 = 7,675,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 7,825,000.00
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 7,921,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 22,500.00 = 7,943,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 7,996,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,996,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE II 175,000 175,000.00
ER PPC 300,000 (+) 300,000.00 = 475,000.00
ER PPC 300,000 (+) 300,000.00 = 775,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,025,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,025,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,025,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,125,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,225,000.00
Radical Heat Sink System 250,000 (+) 250,000.00 = 1,475,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,475,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,996,000.00
Weapons and Equipment Cost: (+) 1,475,000.00 = 9,471,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 16,574,250.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,574,250.00
|