Cost Breakdown
Name/Model: Centurion 55 Ton idea 1 CN10-RJ-X
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (184 pts) 11.5 x 10,000 115,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 203,000.00
Myomer (MASC): (275 x 3 x 1,000) + (55 x 2,000) (+) 935,000.00 = 1,138,000.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 5,171,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 6,071,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,271,333.33
Life Support: 50,000 (+) 50,000.00 = 6,321,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 6,431,333.33
Heat Sinks (Double): 14 x 6,000 (+) 84,000.00 = 6,515,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 20,900.00 = 6,536,233.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 6,574,733.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,574,733.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
ER Large Laser 200,000 (+) 200,000.00 = 400,000.00
Hatchet 4 x 5,000 (+) 20,000.00 = 420,000.00
Jump Jets 55 x (3 x 3) x 200 (+) 99,000.00 = 519,000.00
MRM 10 50,000 (+) 50,000.00 = 569,000.00
MRM 10 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 569,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 569,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,574,733.33
Weapons and Equipment Cost: (+) 569,000.00 = 7,143,733.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 11,072,786.67
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,072,787.00
|