Cost Breakdown
Name/Model: Centurion 55 Ton idea 2 CN10-RJ-X
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (160 pts) 10.0 x 10,000 100,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 188,000.00
Myomer (MASC): (330 x 3 x 1,000) + (55 x 2,000) (+) 1,100,000.00 = 1,288,000.00
Engine (XL): (20,000 x 330 x 55) / 75 (+) 4,840,000.00 = 6,128,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,328,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,528,000.00
Life Support: 50,000 (+) 50,000.00 = 7,578,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 7,688,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 7,760,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 20,900.00 = 7,780,900.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 7,819,400.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,819,400.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 160,000.00
Hatchet 4 x 5,000 (+) 20,000.00 = 180,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 455,000.00
Small Laser 11,250 (+) 11,250.00 = 466,250.00
Small Laser 11,250 (+) 11,250.00 = 477,500.00
Small Laser 11,250 (+) 11,250.00 = 488,750.00
Small Laser 11,250 (+) 11,250.00 = 500,000.00
SRM 6 80,000 (+) 80,000.00 = 580,000.00
SRM 6 80,000 (+) 80,000.00 = 660,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 660,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 660,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,819,400.00
Weapons and Equipment Cost: (+) 660,000.00 = 8,479,400.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 13,143,070.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,143,070.00
|