Cost Breakdown
Name/Model: Thumper TH-2a
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (208 pts) 13.0 x 10,000 130,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 258,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 418,000.00
Engine (XL): (20,000 x 400 x 80) / 75 (+) 8,533,333.33 = 8,951,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 10,151,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 10,351,333.33
Life Support: 50,000 (+) 50,000.00 = 10,401,333.33
Sensors: 80 x 2,000 (+) 160,000.00 = 10,561,333.33
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 10,633,333.33
Arm Actuators: 80 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 26,400.00 = 10,659,733.33
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 10,715,733.33
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,715,733.33
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
ER Large Laser 200,000 (+) 200,000.00 = 350,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 550,000.00
Medium Laser 40,000 (+) 40,000.00 = 590,000.00
Medium Laser 40,000 (+) 40,000.00 = 630,000.00
Medium Laser 40,000 (+) 40,000.00 = 670,000.00
Thumper 187,500 (+) 187,500.00 = 857,500.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 857,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 857,500.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,715,733.33
Weapons and Equipment Cost: (+) 857,500.00 = 11,573,233.33
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 20,831,820.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,831,820.00
|