Cost Breakdown
Name/Model: Mallard M-RD-1
Technology: Inner Sphere
Tonnage: 20
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (64 pts) 4.0 x 10,000 40,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 60,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 70,000.00
Engine (Fuel Cell) (3,500 x 100 x 20) / 75 (+) 93,333.33 = 163,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 165,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 167,833.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 167,833.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Compartment, Infantry (3 ton) 6 x 0 (+) 0.00 = 150,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 155,000.00
SRM 4 60,000 (+) 60,000.00 = 215,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 215,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 215,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 167,833.33
Weapons and Equipment Cost (+) 215,000.00 = 382,833.33
Combat Vehicle Cost Multiplier 1 + (20 / 100) (*) 1.2 = 459,400.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 459,400.00
|