Cost Breakdown
Name/Model: Juggernaut II
Technology: Inner Sphere
Tonnage: 100
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (304 pts) 38.0 x 15,000 570,000.00
Internal Structure (Reinforced): 100 x 6,400 x 1 (+) 640,000.00 = 1,210,000.00
Myomer (Triple-Strength): 100 x 16,000 (+) 1,600,000.00 = 2,810,000.00
Engine (Light Fusion): (15,000 x 300 x 100) / 75 (+) 6,000,000.00 = 8,810,000.00
Gyro (Compact): (Armored) 4.5 x 400,000 + (2 x 150,000) (+) 2,100,000.00 = 10,910,000.00
Cockpit (Small): (Armored) 175,000 + (1 x 150,000) (+) 325,000.00 = 11,235,000.00
Life Support: 50,000 (+) 50,000.00 = 11,285,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 11,485,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 11,557,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 46,000.00 = 11,603,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 11,673,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 11,673,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 830,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 910,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 990,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 1,070,000.00
Full-Head Ejection System 1,725,000 (+) 1,725,000.00 = 2,795,000.00
Heavy PPC 250,000 (+) 250,000.00 = 3,045,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 3,061,000.00
Void-Signature System 2,000,000 (+) 2,000,000.00 = 5,061,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 5,061,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 11,673,000.00
Weapons and Equipment Cost: (+) 5,061,000.00 = 16,734,000.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 33,468,000.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 33,468,000.00
|