Cost Breakdown
Name/Model: Centurion (3080 Refit) CN9-A-Re80
Technology: Inner Sphere
Tonnage: 50
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous): (158 pts) 8.0 x 25,000 200,000.00
Internal Structure (Standard): 50 x 400 x 1 (+) 20,000.00 = 220,000.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 320,000.00
Engine (Fusion): (5,000 x 200 x 50) / 75 (+) 666,666.67 = 986,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,586,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 1,786,666.67
Life Support: 50,000 (+) 50,000.00 = 1,836,666.67
Sensors: 50 x 2,000 (+) 100,000.00 = 1,936,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 1,996,666.67
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 19,000.00 = 2,015,666.67
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 2,050,666.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,050,666.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 180,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 260,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 660,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 660,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 660,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 660,000.00
LRM 10 w/ Artemis IV FCS 100,000 + 100,000 (+) 200,000.00 = 860,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 860,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,050,666.67
Weapons and Equipment Cost: (+) 860,000.00 = 2,910,666.67
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 4,366,000.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,366,000.00
|