Cost Breakdown
Name/Model: Tian-Zong TNZ-X1
Technology: Inner Sphere (Mixed)
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Stealth): (216 pts) 13.5 x 50,000 675,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 795,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 945,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,445,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,645,000.00
Cockpit (Small): 175,000 (+) 175,000.00 = 9,820,000.00
Life Support: 50,000 (+) 50,000.00 = 9,870,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 10,020,000.00
Heat Sinks (Double): 22 x 6,000 (+) 132,000.00 = 10,152,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 10,186,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 10,239,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,239,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ECM Suite (C) 200,000 200,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 500,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 800,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 1,100,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,100,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,239,000.00
Weapons and Equipment Cost: (+) 1,100,000.00 = 11,339,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 19,843,250.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 19,843,250.00
|