Cost Breakdown
Name/Model: Peveus Maximus
Technology: Inner Sphere (Mixed)
Tonnage: 200
Configuration: Superheavy Tripod BattleMech
==========================================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------------------
Armor (Patchwork): Varies (see below)
Hardened (516 pts) 64.5 x 15,000 967,500.00
Stealth (168 pts) 10.5 x 50,000 (+) 525,000.00 = 1,492,500.00
Internal Structure (Endo Steel): 200 x 16,000 x 1.2 (+) 3,840,000.00 = 5,332,500.00
Myomer (Superheavy): 200 x 12,000 (+) 2,400,000.00 = 7,732,500.00
Engine (Compact): (10,000 x 200 x 200) / 75 (+) 5,333,333.33 = 13,065,833.33
Gyro (Superheavy): 4.0 x 500,000 (+) 2,000,000.00 = 15,065,833.33
Cockpit (Superheavy Tripod): 500,000 (+) 500,000.00 = 15,565,833.33
Life Support: 50,000 (+) 50,000.00 = 15,615,833.33
Sensors: 200 x 2,000 (+) 400,000.00 = 16,015,833.33
Heat Sinks (Double): 24 x 6,000 (+) 144,000.00 = 16,159,833.33
Arm Actuators: 200 x ((100 x 2 x 2) + (50 x 0 x 2) + (80 x 0 x 2)) (+) 80,000.00 = 16,239,833.33
Leg Actuators: 200 x ((150 x 3 x 2) + (80 x 3 x 2) + (120 x 3 x 2)) (+) 420,000.00 = 16,659,833.33
------------------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 16,659,833.33
==========================================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------------------
Arrow IV System (C) 450,000 450,000.00
Arrow IV System (C) 450,000 (+) 450,000.00 = 900,000.00
Full-Head Ejection System (C) 1,725,000 (+) 1,725,000.00 = 2,625,000.00
Improved ATM 9 (C) 450,000 (+) 450,000.00 = 3,075,000.00
Improved ATM 9 (C) 450,000 (+) 450,000.00 = 3,525,000.00
Improved ATM 9 (C) 450,000 (+) 450,000.00 = 3,975,000.00
Improved ATM 9 (C) 450,000 (+) 450,000.00 = 4,425,000.00
Improved ATM 9 (C) 450,000 (+) 450,000.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Improved ATM 9 (Ammo 7) [Empty Bin] (C) 0 (+) 0.00 = 4,875,000.00
Laser Anti-Missile System (C) 225,000 (+) 225,000.00 = 5,100,000.00
Radical Heat Sink System 250,000 (+) 250,000.00 = 5,350,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 5,550,000.00
Small Shield 50,000 (+) 50,000.00 = 5,600,000.00
------------------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 5,600,000.00
==========================================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 16,659,833.33
Weapons and Equipment Cost: (+) 5,600,000.00 = 22,259,833.33
BattleMech Cost Multiplier: 1 + (200 / 100) (*) 3.00 = 66,779,500.00
------------------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 66,779,500.00
|