Cost Breakdown
Name/Model: Thunderbolt (C3s) TDR-60-RLA
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard): 65 x 400 x 1 (+) 26,000.00 = 256,000.00
Myomer (Triple-Strength): 65 x 16,000 (+) 1,040,000.00 = 1,296,000.00
Engine (XL): (20,000 x 325 x 65) / 75 (+) 5,633,333.33 = 6,929,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 8,129,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,329,333.33
Life Support: 50,000 (+) 50,000.00 = 8,379,333.33
Sensors: 65 x 2,000 (+) 130,000.00 = 8,509,333.33
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 8,581,333.33
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 29,900.00 = 8,611,233.33
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 8,656,733.33
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,656,733.33
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 330,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 410,000.00
Jump Jets 65 x (5 x 5) x 200 (+) 325,000.00 = 735,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 795,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 855,000.00
Small Laser 11,250 (+) 11,250.00 = 866,250.00
Small Laser 11,250 (+) 11,250.00 = 877,500.00
Small Pulse Laser 16,000 (+) 16,000.00 = 893,500.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,193,500.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,493,500.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,493,500.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,656,733.33
Weapons and Equipment Cost: (+) 1,493,500.00 = 10,150,233.33
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 16,747,885.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,747,885.00
|