Cost Breakdown
Name/Model: Black Knight BL-1K-KNT
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (215 pts) 12.0 x 20,000 240,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 360,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,560,000.00
Engine (Fusion): (5,000 x 375 x 75) / 75 (+) 1,875,000.00 = 3,435,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 4,635,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,835,000.00
Life Support: 50,000 (+) 50,000.00 = 4,885,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 5,035,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 5,095,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 5,129,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 5,182,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,182,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Jump Jets 75 x (5 x 5) x 200 375,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 435,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 495,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 555,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 615,000.00
Small Laser 11,250 (+) 11,250.00 = 626,250.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 626,250.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,182,000.00
Weapons and Equipment Cost: (+) 626,250.00 = 5,808,250.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 10,164,437.50
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,164,438.00
|