Cost Breakdown
Name/Model: Charger CGR-D
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (179 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard): 80 x 400 x 1 (+) 32,000.00 = 232,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 392,000.00
Engine (XL): (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 7,218,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 8,418,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,618,666.67
Life Support: 50,000 (+) 50,000.00 = 8,668,666.67
Sensors: 80 x 2,000 (+) 160,000.00 = 8,828,666.67
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 8,924,666.67
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 24,000.00 = 8,948,666.67
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 9,004,666.67
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,004,666.67
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Heavy PPC 250,000 (+) 250,000.00 = 500,000.00
Heavy PPC 250,000 (+) 250,000.00 = 750,000.00
Heavy PPC 250,000 (+) 250,000.00 = 1,000,000.00
Jump Jets 80 x (4 x 4) x 200 (+) 256,000.00 = 1,256,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,256,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,004,666.67
Weapons and Equipment Cost: (+) 1,256,000.00 = 10,260,666.67
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 18,469,200.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,469,200.00
|