Cost Breakdown
Name/Model: Banshee BNC-D
Technology: Inner Sphere
Tonnage: 95
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (293 pts) 17.5 x 15,000 262,500.00
Internal Structure (Endo Steel): 95 x 1,600 x 1 (+) 152,000.00 = 414,500.00
Myomer (Standard): 95 x 2,000 (+) 190,000.00 = 604,500.00
Engine (XL): (20,000 x 380 x 95) / 75 (+) 9,626,666.67 = 10,231,166.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 11,431,166.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 11,631,166.67
Life Support: 50,000 (+) 50,000.00 = 11,681,166.67
Sensors: 95 x 2,000 (+) 190,000.00 = 11,871,166.67
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 11,967,166.67
Arm Actuators: 95 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 28,500.00 = 11,995,666.67
Leg Actuators: 95 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 66,500.00 = 12,062,166.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 12,062,166.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 450,000.00
Heavy PPC 250,000 (+) 250,000.00 = 700,000.00
Heavy PPC 250,000 (+) 250,000.00 = 950,000.00
Heavy PPC 250,000 (+) 250,000.00 = 1,200,000.00
Light PPC 150,000 (+) 150,000.00 = 1,350,000.00
Light PPC 150,000 (+) 150,000.00 = 1,500,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,500,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 12,062,166.67
Weapons and Equipment Cost: (+) 1,500,000.00 = 13,562,166.67
BattleMech Cost Multiplier: 1 + (95 / 100) (*) 1.95 = 26,446,225.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 26,446,225.00
|