Cost Breakdown
Name/Model: Behemoth BHN-7H
Technology: Inner Sphere
Tonnage: 100
Configuration: Biped BattleMech
=================================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (272 pts) 17.0 x 10,000 170,000.00
Internal Structure (Standard): 100 x 400 x 1 (+) 40,000.00 = 210,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 410,000.00
Engine (Fusion): (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,410,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,310,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,510,000.00
Life Support: 50,000 (+) 50,000.00 = 3,560,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 3,760,000.00
Heat Sinks (Double): 17 x 6,000 (+) 102,000.00 = 3,862,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 30,000.00 = 3,892,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 3,962,000.00
---------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,962,000.00
=================================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
CASE 50,000 (+) 50,000.00 = 100,000.00
ER PPC 300,000 (+) 300,000.00 = 400,000.00
ER PPC 300,000 (+) 300,000.00 = 700,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,100,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
---------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,500,000.00
=================================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,962,000.00
Weapons and Equipment Cost: (+) 1,500,000.00 = 5,462,000.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 10,924,000.00
---------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,924,000.00
|