Cost Breakdown
Name/Model: Timberwolf (Mad Cat) CF1
Technology: Clan
Tonnage: 75
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (231 pts) 12.5 x 20,000 250,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 370,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 520,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,020,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,220,000.00
Cockpit (Small): 175,000 (+) 175,000.00 = 9,395,000.00
Life Support: 50,000 (+) 50,000.00 = 9,445,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,595,000.00
Heat Sinks (Double): 17 x 6,000 (+) 102,000.00 = 9,697,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 22,500.00 = 9,719,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 9,772,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,772,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
ATM 3 50,000 50,000.00
ATM 3 50,000 (+) 50,000.00 = 100,000.00
ATM 3 50,000 (+) 50,000.00 = 150,000.00
ATM 3 50,000 (+) 50,000.00 = 200,000.00
ATM 3 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 200,000.00
ATM 3 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 200,000.00
ATM 3 (Ammo 20) [HE] [Empty Bin] 0 (+) 0.00 = 200,000.00
ATM 3 (Ammo 20) [HE] [Empty Bin] 0 (+) 0.00 = 200,000.00
CASE 2 x 50,000 (+) 100,000.00 = 300,000.00
ER PPC 300,000 (+) 300,000.00 = 600,000.00
ER PPC 300,000 (+) 300,000.00 = 900,000.00
Jump Jets 75 x (4 x 4) x 200 (+) 240,000.00 = 1,140,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,140,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,772,000.00
Weapons and Equipment Cost: (+) 1,140,000.00 = 10,912,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 19,096,000.00
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 19,096,000.00
|