Cost Breakdown
Name/Model: Dervish DV-6C2
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (163 pts) 8.5 x 20,000 170,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 258,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 368,000.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,401,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,301,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 5,476,333.33
Life Support: 50,000 (+) 50,000.00 = 5,526,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 5,636,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 5,696,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 16,500.00 = 5,712,833.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 5,751,333.33
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,751,333.33
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
CASE (C) 5 x 50,000 250,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 525,000.00
Light PPC 150,000 (+) 150,000.00 = 675,000.00
Light PPC 150,000 (+) 150,000.00 = 825,000.00
LRM 10 (C) 100,000 (+) 100,000.00 = 925,000.00
LRM 10 (C) 100,000 (+) 100,000.00 = 1,025,000.00
LRM 10 (Ammo 12) [Empty Bin] (C) 0 (+) 0.00 = 1,025,000.00
LRM 10 (Ammo 12) [Empty Bin] (C) 0 (+) 0.00 = 1,025,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,075,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,125,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,175,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,225,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,225,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,225,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,225,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,225,000.00
=========================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,751,333.33
Weapons and Equipment Cost: (+) 1,225,000.00 = 6,976,333.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,813,316.67
-------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,813,317.00
|