Cost Breakdown
Name/Model: Grounded Bug ISTG-1A
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped IndustrialMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (64 pts) 4.0 x 10,000 40,000.00
Internal Structure (Industrial): 30 x 300 x 1 (+) 9,000.00 = 49,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 109,000.00
Engine (Fuel Cell): (3,500 x 180 x 30) / 75 (+) 252,000.00 = 361,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 961,000.00
Cockpit (Industrial w/ Adv. FCS): 200,000 (+) 200,000.00 = 1,161,000.00
Life Support: 50,000 (+) 50,000.00 = 1,211,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 1,271,000.00
Heat Sinks (Single): 4 x 2,000 (+) 8,000.00 = 1,279,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 13,800.00 = 1,292,800.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 1,313,800.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,313,800.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Ejection Seat 25,000 25,000.00
Machine Gun 5,000 (+) 5,000.00 = 30,000.00
Machine Gun 5,000 (+) 5,000.00 = 35,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 35,000.00
Medium Laser 40,000 (+) 40,000.00 = 75,000.00
Power Amplifier 0.5 x 20,000 (+) 10,000.00 = 85,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 85,000.00
========================================================================================================================
IndustrialMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,313,800.00
Weapons and Equipment Cost: (+) 85,000.00 = 1,398,800.00
IndustrialMech Cost Multiplier: 1 + (30 / 400) (*) 1.08 = 1,503,710.00
------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 1,503,710.00
|