Cost Breakdown
Name/Model: Hitotsume Kozo (Titan) HKZ-1P-T
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (179 pts) 22.5 x 15,000 337,500.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 425,500.00
Myomer (Triple-Strength): 55 x 16,000 (+) 880,000.00 = 1,305,500.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 5,338,833.33
Gyro (XL): 1.5 x 750,000 (+) 1,125,000.00 = 6,463,833.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,663,833.33
Life Support: 50,000 (+) 50,000.00 = 6,713,833.33
Sensors: 55 x 2,000 (+) 110,000.00 = 6,823,833.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 6,883,833.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 6,909,133.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 6,947,633.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,947,633.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Hatchet 4 x 5,000 (+) 20,000.00 = 320,000.00
Jump Jets 55 x (4 x 4) x 200 (+) 176,000.00 = 496,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 556,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 616,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 616,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,947,633.33
Weapons and Equipment Cost: (+) 616,000.00 = 7,563,633.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 11,723,631.67
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 11,723,632.00
|