Cost Breakdown
Name/Model: Wolverine WVR-7K4
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (178 pts) 10.5 x 15,000 157,500.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 245,500.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 355,500.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,388,833.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,288,833.33
Cockpit (Small): 175,000 (+) 175,000.00 = 5,463,833.33
Life Support: 50,000 (+) 50,000.00 = 5,513,833.33
Sensors: 55 x 2,000 (+) 110,000.00 = 5,623,833.33
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 5,701,833.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 20,900.00 = 5,722,733.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 5,761,233.33
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,761,233.33
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
CASE II 175,000 175,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 450,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 700,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 800,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 900,000.00
Small X-Pulse Laser 31,000 (+) 31,000.00 = 931,000.00
Small X-Pulse Laser 31,000 (+) 31,000.00 = 962,000.00
Streak SRM 4 90,000 (+) 90,000.00 = 1,052,000.00
Streak SRM 4 90,000 (+) 90,000.00 = 1,142,000.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 1,142,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,142,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,761,233.33
Weapons and Equipment Cost: (+) 1,142,000.00 = 6,903,233.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,700,011.67
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,700,012.00
|