Cost Breakdown
Name/Model: Ridge Runner RDR-34C
Technology: Inner Sphere
Tonnage: 40
Configuration: Biped BattleMech
===========================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (137 pts) 9.0 x 10,000 90,000.00
Internal Structure (Standard): 40 x 400 x 1 (+) 16,000.00 = 106,000.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 186,000.00
Engine (XL): (20,000 x 280 x 40) / 75 (+) 2,986,666.67 = 3,172,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,072,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,272,666.67
Life Support: 50,000 (+) 50,000.00 = 4,322,666.67
Sensors: 40 x 2,000 (+) 80,000.00 = 4,402,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 4,462,666.67
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 15,200.00 = 4,477,866.67
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 4,505,866.67
---------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,505,866.67
===========================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------------
ER Flamer 15,000 15,000.00
Machine Gun 5,000 (+) 5,000.00 = 20,000.00
Machine Gun 5,000 (+) 5,000.00 = 25,000.00
Machine Gun 5,000 (+) 5,000.00 = 30,000.00
Machine Gun 5,000 (+) 5,000.00 = 35,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 35,000.00
Machine Gun Array Module 1,250 (+) 1,250.00 = 36,250.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 336,250.00
SRM 4 60,000 (+) 60,000.00 = 396,250.00
SRM 4 (Ammo 25) [Inferno] [Empty Bin] 0 (+) 0.00 = 396,250.00
---------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 396,250.00
===========================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,505,866.67
Weapons and Equipment Cost: (+) 396,250.00 = 4,902,116.67
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 6,862,963.33
---------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,862,963.00
|