Cost Breakdown
Name/Model: Katana (Mixed Crockett) CRK-5004-7
Technology: Inner Sphere (Mixed)
Tonnage: 85
Configuration: Biped BattleMech
====================================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (263 pts) 14.0 x 20,000 280,000.00
Internal Structure (Standard): 85 x 400 x 1 (+) 34,000.00 = 314,000.00
Myomer (Triple-Strength): 85 x 16,000 (+) 1,360,000.00 = 1,674,000.00
Engine (XL): (20,000 x 340 x 85) / 75 (+) 7,706,666.67 = 9,380,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 10,580,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 10,780,666.67
Life Support: 50,000 (+) 50,000.00 = 10,830,666.67
Sensors: 85 x 2,000 (+) 170,000.00 = 11,000,666.67
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 11,090,666.67
Arm Actuators: 85 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 25,500.00 = 11,116,166.67
Leg Actuators: 85 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 59,500.00 = 11,175,666.67
------------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 11,175,666.67
====================================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------------
CASE II (C) 175,000 175,000.00
CASE II (C) 175,000 (+) 175,000.00 = 350,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 550,000.00
ER Large Laser (C) 200,000 (+) 200,000.00 = 750,000.00
Heavy Small Laser (C) 20,000 (+) 20,000.00 = 770,000.00
Heavy Small Laser (C) 20,000 (+) 20,000.00 = 790,000.00
Jump Jets 85 x (4 x 4) x 200 (+) 272,000.00 = 1,062,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 1,462,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,462,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,462,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,462,000.00
SRM 6 (Ammo 15) [Artemis IV] [Empty Bin] (C) 0 (+) 0.00 = 1,462,000.00
SRM 6 (Ammo 15) [Artemis IV] [Empty Bin] (C) 0 (+) 0.00 = 1,462,000.00
SRM 6 w/ Artemis IV FCS (C) 80,000 + 100,000 (+) 180,000.00 = 1,642,000.00
SRM 6 w/ Artemis IV FCS (C) 80,000 + 100,000 (+) 180,000.00 = 1,822,000.00
Supercharger (C) 340 x 10,000 (+) 3,400,000.00 = 5,222,000.00
Watchdog CEWS (C) 600,000 (+) 600,000.00 = 5,822,000.00
------------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 5,822,000.00
====================================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 11,175,666.67
Weapons and Equipment Cost: (+) 5,822,000.00 = 16,997,666.67
BattleMech Cost Multiplier: 1 + (85 / 100) (*) 1.85 = 31,445,683.33
------------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 31,445,683.00
|