Cost Breakdown
Name/Model: Leo L30-A1T
Technology: Inner Sphere
Tonnage: 40
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (135 pts) 8.0 x 15,000 120,000.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 184,000.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 264,000.00
Engine (XL): (20,000 x 200 x 40) / 75 (+) 2,133,333.33 = 2,397,333.33
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,997,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,197,333.33
Life Support: 50,000 (+) 50,000.00 = 3,247,333.33
Sensors: 40 x 2,000 (+) 80,000.00 = 3,327,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,387,333.33
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 15,200.00 = 3,402,533.33
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 3,430,533.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,430,533.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Jump Jets 40 x (3 x 3) x 200 (+) 72,000.00 = 372,000.00
LRM 10 100,000 (+) 100,000.00 = 472,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 472,000.00
Shoulder Turret 0.5 x 10,000 (+) 5,000.00 = 477,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 777,000.00
SRM 4 60,000 (+) 60,000.00 = 837,000.00
SRM 4 60,000 (+) 60,000.00 = 897,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 897,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 897,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,430,533.33
Weapons and Equipment Cost: (+) 897,000.00 = 4,327,533.33
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 6,058,546.67
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,058,547.00
|