Cost Breakdown
Name/Model: Firebee FRB-6MH
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous): (109 pts) 5.5 x 25,000 137,500.00
Internal Structure (Standard): 35 x 400 x 1 (+) 14,000.00 = 151,500.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 221,500.00
Engine (XL): (20,000 x 210 x 35) / 75 (+) 1,960,000.00 = 2,181,500.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,081,500.00
Cockpit (Small): 175,000 (+) 175,000.00 = 3,256,500.00
Life Support: 50,000 (+) 50,000.00 = 3,306,500.00
Sensors: 35 x 2,000 (+) 70,000.00 = 3,376,500.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,436,500.00
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 13,300.00 = 3,449,800.00
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 3,474,300.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,474,300.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 250,000.00
Jump Jets 35 x (5 x 5) x 200 (+) 175,000.00 = 425,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 725,000.00
SRM 2 10,000 (+) 10,000.00 = 735,000.00
SRM 2 10,000 (+) 10,000.00 = 745,000.00
SRM 2 10,000 (+) 10,000.00 = 755,000.00
SRM 2 10,000 (+) 10,000.00 = 765,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 765,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 765,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 765,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,474,300.00
Weapons and Equipment Cost: (+) 765,000.00 = 4,239,300.00
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 5,723,055.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,723,055.00
|