Cost Breakdown
Name/Model: Rouge
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (91 pts) 6.0 x 10,000 60,000.00
Internal Structure (Standard): 30 x 400 x 1 (+) 12,000.00 = 72,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 132,000.00
Engine (XXL): (100,000 x 150 x 30) / 75 (+) 6,000,000.00 = 6,132,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 6,732,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,932,000.00
Life Support: 50,000 (+) 50,000.00 = 6,982,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 7,042,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 6,000.00 = 7,048,000.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 7,069,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,069,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Jump Jets 30 x (3 x 3) x 200 54,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 304,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 304,000.00
Small Laser 11,250 (+) 11,250.00 = 315,250.00
Small Laser 11,250 (+) 11,250.00 = 326,500.00
Streak SRM 2 15,000 (+) 15,000.00 = 341,500.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 341,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 341,500.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,069,000.00
Weapons and Equipment Cost: (+) 341,500.00 = 7,410,500.00
BattleMech Cost Multiplier: 1 + (30 / 100) (*) 1.30 = 9,633,650.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,633,650.00
|