Cost Breakdown
Name/Model: Cyclops CP-11-AS
Technology: Inner Sphere
Tonnage: 90
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (267 pts) 15.0 x 20,000 300,000.00
Internal Structure (Standard): 90 x 400 x 1 (+) 36,000.00 = 336,000.00
Myomer (Standard): 90 x 2,000 (+) 180,000.00 = 516,000.00
Engine (Fusion): (5,000 x 360 x 90) / 75 (+) 2,160,000.00 = 2,676,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 3,876,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,076,000.00
Life Support: 50,000 (+) 50,000.00 = 4,126,000.00
Sensors: 90 x 2,000 (+) 180,000.00 = 4,306,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 4,366,000.00
Arm Actuators: 90 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 41,400.00 = 4,407,400.00
Leg Actuators: 90 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 63,000.00 = 4,470,400.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,470,400.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 625,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 625,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,470,400.00
Weapons and Equipment Cost: (+) 625,000.00 = 5,095,400.00
BattleMech Cost Multiplier: 1 + (90 / 100) (*) 1.90 = 9,681,260.00
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,681,260.00
|