Cost Breakdown
Name/Model: Thunderbolt TDR-HOW
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (197 pts) 11.0 x 20,000 220,000.00
Internal Structure (Endo Steel): 65 x 1,600 x 1 (+) 104,000.00 = 324,000.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 454,000.00
Engine (Fusion): (5,000 x 260 x 65) / 75 (+) 1,126,666.67 = 1,580,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,480,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,680,666.67
Life Support: 50,000 (+) 50,000.00 = 2,730,666.67
Sensors: 65 x 2,000 (+) 130,000.00 = 2,860,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,920,666.67
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 29,900.00 = 2,950,566.67
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 2,996,066.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,996,066.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
CASE 50,000 (+) 50,000.00 = 100,000.00
Jump Jets 65 x (4 x 4) x 200 (+) 208,000.00 = 308,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 483,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 883,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 883,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 883,000.00
LRM 10 100,000 (+) 100,000.00 = 983,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 983,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 983,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,996,066.67
Weapons and Equipment Cost: (+) 983,000.00 = 3,979,066.67
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 6,565,460.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,565,460.00
|