Cost Breakdown
Name/Model: Ripper RP-1N
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Stealth): (104 pts) 6.5 x 50,000 325,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 381,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 451,000.00
Engine (XL): (20,000 x 245 x 35) / 75 (+) 2,286,666.67 = 2,737,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,637,666.67
Cockpit (Small): 175,000 (+) 175,000.00 = 3,812,666.67
Life Support: 50,000 (+) 50,000.00 = 3,862,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 3,932,666.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 3,998,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 7,000.00 = 4,005,666.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 4,030,166.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,030,166.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Actuator Enhancement System 35 x 500 17,500.00
Actuator Enhancement System 35 x 500 (+) 17,500.00 = 35,000.00
Coolant Pod 50,000 (+) 50,000.00 = 85,000.00
ER Small Laser 11,250 (+) 11,250.00 = 96,250.00
ER Small Laser 11,250 (+) 11,250.00 = 107,500.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 307,500.00
Light PPC 150,000 (+) 150,000.00 = 457,500.00
Light PPC 150,000 (+) 150,000.00 = 607,500.00
PPC Capacitor 150,000 (+) 150,000.00 = 757,500.00
PPC Capacitor 150,000 (+) 150,000.00 = 907,500.00
Supercharger 245 x 10,000 (+) 2,450,000.00 = 3,357,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,357,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,030,166.67
Weapons and Equipment Cost: (+) 3,357,500.00 = 7,387,666.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 9,973,350.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 9,973,350.00
|