Cost Breakdown
Name/Model: Focht FCT-8A
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous): (208 pts) 10.5 x 25,000 262,500.00
Internal Structure (Standard): 65 x 400 x 1 (+) 26,000.00 = 288,500.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 418,500.00
Engine (XL): (20,000 x 325 x 65) / 75 (+) 5,633,333.33 = 6,051,833.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,251,833.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,451,833.33
Life Support: 50,000 (+) 50,000.00 = 7,501,833.33
Sensors: 65 x 2,000 (+) 130,000.00 = 7,631,833.33
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 7,721,833.33
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 24,700.00 = 7,746,533.33
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 7,792,033.33
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,792,033.33
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Heavy PPC 250,000 (+) 250,000.00 = 500,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 600,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 700,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 800,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 900,000.00
Small Re-engineered Laser 25,000 (+) 25,000.00 = 925,000.00
Small Re-engineered Laser 25,000 (+) 25,000.00 = 950,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 950,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,792,033.33
Weapons and Equipment Cost: (+) 950,000.00 = 8,742,033.33
BattleMech Cost Multiplier: 1 + (65 / 100) (*) 1.65 = 14,424,355.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 14,424,355.00
|