Cost Breakdown
Name/Model: Charger (ChuChu) CGR-ChuHD
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (247 pts) 15.5 x 10,000 155,000.00
Internal Structure (Endo Steel): 80 x 1,600 x 1 (+) 128,000.00 = 283,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 443,000.00
Engine (XL): (20,000 x 400 x 80) / 75 (+) 8,533,333.33 = 8,976,333.33
Gyro (Heavy-Duty): 8.0 x 500,000 (+) 4,000,000.00 = 12,976,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 13,176,333.33
Life Support: 50,000 (+) 50,000.00 = 13,226,333.33
Sensors: 80 x 2,000 (+) 160,000.00 = 13,386,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 13,446,333.33
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 30,400.00 = 13,476,733.33
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 13,532,733.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,532,733.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Heavy PPC 250,000 250,000.00
Jump Jets 80 x (5 x 5) x 200 (+) 400,000.00 = 650,000.00
Mace 130,000 (+) 130,000.00 = 780,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 780,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,532,733.33
Weapons and Equipment Cost: (+) 780,000.00 = 14,312,733.33
BattleMech Cost Multiplier: 1 + (80 / 100) (*) 1.80 = 25,762,920.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 25,762,920.00
|