Cost Breakdown
Name/Model: Custodian
Technology: Clan
Tonnage: 45
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (144 pts) 7.5 x 20,000 150,000.00
Internal Structure (Endo Steel): 45 x 1,600 x 1 (+) 72,000.00 = 222,000.00
Myomer (Standard): 45 x 2,000 (+) 90,000.00 = 312,000.00
Engine (XL): (20,000 x 135 x 45) / 75 (+) 1,620,000.00 = 1,932,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,532,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,732,000.00
Life Support: 50,000 (+) 50,000.00 = 2,782,000.00
Sensors: 45 x 2,000 (+) 90,000.00 = 2,872,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,932,000.00
Arm Actuators: 45 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 14,850.00 = 2,946,850.00
Leg Actuators: 45 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 31,500.00 = 2,978,350.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,978,350.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER PPC 300,000 (+) 300,000.00 = 400,000.00
Jump Jets 45 x (2 x 2) x 200 (+) 36,000.00 = 436,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 686,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 936,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 936,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 936,000.00
LRM 10 100,000 (+) 100,000.00 = 1,036,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,036,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,036,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,036,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,978,350.00
Weapons and Equipment Cost: (+) 1,036,000.00 = 4,014,350.00
BattleMech Cost Multiplier: 1 + (45 / 100) (*) 1.45 = 5,820,807.50
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,820,808.00
|