Cost Breakdown
Name/Model: Leadwall
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (211 pts) 12.5 x 15,000 187,500.00
Internal Structure (Endo Steel): 70 x 1,600 x 1 (+) 112,000.00 = 299,500.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 439,500.00
Engine (XL): (20,000 x 350 x 70) / 75 (+) 6,533,333.33 = 6,972,833.33
Gyro (XL): 2.0 x 750,000 (+) 1,500,000.00 = 8,472,833.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,672,833.33
Life Support: 50,000 (+) 50,000.00 = 8,722,833.33
Sensors: 70 x 2,000 (+) 140,000.00 = 8,862,833.33
Arm Actuators: 70 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 23,100.00 = 8,885,933.33
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 8,934,933.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,934,933.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
Rotary AC/2 175,000 (+) 175,000.00 = 575,000.00
Rotary AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 575,000.00
Rotary AC/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 575,000.00
Ultra AC/5 200,000 (+) 200,000.00 = 775,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 775,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 775,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 775,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,934,933.33
Weapons and Equipment Cost: (+) 775,000.00 = 9,709,933.33
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 16,506,886.67
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,506,887.00
|