Cost Breakdown
Name/Model: Grand Awesome GRD-ASM-1
Technology: Inner Sphere
Tonnage: 190
Configuration: Superheavy Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (570 pts) 32.0 x 20,000 640,000.00
Internal Structure (Standard): 190 x 4,000 x 1 (+) 760,000.00 = 1,400,000.00
Myomer (Superheavy): 190 x 12,000 (+) 2,280,000.00 = 3,680,000.00
Engine (Fusion): (5,000 x 380 x 190) / 75 (+) 4,813,333.33 = 8,493,333.33
Gyro (Superheavy): 8.0 x 500,000 (+) 4,000,000.00 = 12,493,333.33
Cockpit (Superheavy): 300,000 (+) 300,000.00 = 12,793,333.33
Life Support: 50,000 (+) 50,000.00 = 12,843,333.33
Sensors: 190 x 2,000 (+) 380,000.00 = 13,223,333.33
Heat Sinks (Double): 28 x 6,000 (+) 168,000.00 = 13,391,333.33
Arm Actuators: 190 x ((100 x 2 x 2) + (50 x 2 x 2) + (80 x 1 x 2)) (+) 144,400.00 = 13,535,733.33
Leg Actuators: 190 x ((150 x 2 x 2) + (80 x 2 x 2) + (120 x 2 x 2)) (+) 266,000.00 = 13,801,733.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,801,733.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Light PPC 150,000 150,000.00
Light PPC 150,000 (+) 150,000.00 = 300,000.00
Medium Laser 40,000 (+) 40,000.00 = 340,000.00
Medium Laser 40,000 (+) 40,000.00 = 380,000.00
Medium Laser 40,000 (+) 40,000.00 = 420,000.00
PPC 200,000 (+) 200,000.00 = 620,000.00
PPC 200,000 (+) 200,000.00 = 820,000.00
PPC 200,000 (+) 200,000.00 = 1,020,000.00
PPC 200,000 (+) 200,000.00 = 1,220,000.00
TSEMP Cannon 800,000 (+) 800,000.00 = 2,020,000.00
TSEMP Cannon 800,000 (+) 800,000.00 = 2,820,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,820,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,801,733.33
Weapons and Equipment Cost: (+) 2,820,000.00 = 16,621,733.33
BattleMech Cost Multiplier: 1 + (190 / 100) (*) 2.90 = 48,203,026.67
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 48,203,027.00
|