Cost Breakdown
Name/Model: Sneeper
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
==========================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------
Armor (Hardened): (184 pts) 23.0 x 15,000 345,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 433,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 543,000.00
Engine (XL): (20,000 x 165 x 55) / 75 (+) 2,420,000.00 = 2,963,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 3,563,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 3,763,000.00
Life Support: 50,000 (+) 50,000.00 = 3,813,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 3,923,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,983,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 11,000.00 = 3,994,000.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 4,032,500.00
--------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,032,500.00
==========================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------
Actuator Enhancement System (C) 55 x 500 27,500.00
CASE (C) 1 x 50,000 (+) 50,000.00 = 77,500.00
ECM Suite (C) 200,000 (+) 200,000.00 = 277,500.00
Gauss Rifle (C) 300,000 (+) 300,000.00 = 577,500.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 577,500.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 577,500.00
Medium Pulse Laser (C) 60,000 (+) 60,000.00 = 637,500.00
Medium Pulse Laser (C) 60,000 (+) 60,000.00 = 697,500.00
Void-Signature System 2,000,000 (+) 2,000,000.00 = 2,697,500.00
--------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,697,500.00
==========================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,032,500.00
Weapons and Equipment Cost: (+) 2,697,500.00 = 6,730,000.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,431,500.00
--------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,431,500.00
|