Cost Breakdown
Name/Model: Black Knight BL-9-KNT (TSM Refit)
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (224 pts) 14.0 x 10,000 140,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 170,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,370,000.00
Engine (XL): (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 7,370,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 8,270,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,470,000.00
Life Support: 50,000 (+) 50,000.00 = 8,520,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 8,670,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 8,760,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 8,794,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 8,847,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,847,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Hatchet 5 x 5,000 (+) 25,000.00 = 325,000.00
Large Laser 100,000 (+) 100,000.00 = 425,000.00
Large Laser 100,000 (+) 100,000.00 = 525,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 700,000.00
Medium Laser 40,000 (+) 40,000.00 = 740,000.00
Medium Laser 40,000 (+) 40,000.00 = 780,000.00
Medium Laser 40,000 (+) 40,000.00 = 820,000.00
Medium Laser 40,000 (+) 40,000.00 = 860,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 860,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,847,000.00
Weapons and Equipment Cost: (+) 860,000.00 = 9,707,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 16,987,250.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,987,250.00
|