Cost Breakdown
Name/Model: Lao Hu LHU-3AC
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (231 pts) 14.5 x 10,000 145,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 265,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,465,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,965,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 10,165,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 10,365,000.00
Life Support: 50,000 (+) 50,000.00 = 10,415,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 10,565,000.00
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 10,631,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 1) + (80 x 0)) (+) 18,750.00 = 10,649,750.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 10,702,250.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,702,250.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
C3 Computer (Master) 1,500,000 1,500,000.00
ER Large Laser 200,000 (+) 200,000.00 = 1,700,000.00
Heavy PPC 250,000 (+) 250,000.00 = 1,950,000.00
LRM 15 175,000 (+) 175,000.00 = 2,125,000.00
LRM 15 (Ammo 8) [Semi-Guided] [Empty Bin] 0 (+) 0.00 = 2,125,000.00
LRM 15 (Ammo 8) [Semi-Guided] [Empty Bin] 0 (+) 0.00 = 2,125,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,125,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,702,250.00
Weapons and Equipment Cost: (+) 2,125,000.00 = 12,827,250.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 22,447,687.50
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 22,447,688.00
|