Cost Breakdown
Name/Model: Gùn GN-2OL1
Technology: Inner Sphere
Tonnage: 20
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (56 pts) 3.5 x 10,000 35,000.00
Internal Structure (Endo Steel): 20 x 1,600 x 1 (+) 32,000.00 = 67,000.00
Myomer (MASC): (100 x 1 x 1,000) + (20 x 2,000) (+) 140,000.00 = 207,000.00
Engine (Fusion): (5,000 x 100 x 20) / 75 (+) 133,333.33 = 340,333.33
Gyro (XL): 0.5 x 750,000 (+) 375,000.00 = 715,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 890,333.33
Life Support: 50,000 (+) 50,000.00 = 940,333.33
Sensors: 20 x 2,000 (+) 40,000.00 = 980,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 1,040,333.33
Arm Actuators: 20 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 4,000.00 = 1,044,333.33
Leg Actuators: 20 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 14,000.00 = 1,058,333.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,058,333.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
SRM 2 10,000 (+) 10,000.00 = 310,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 310,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 310,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,058,333.33
Weapons and Equipment Cost: (+) 310,000.00 = 1,368,333.33
BattleMech Cost Multiplier: 1 + (20 / 100) (*) 1.20 = 1,642,000.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 1,642,000.00
|