Cost Breakdown
Name/Model: Black Knight (Montgomery) BL-9-KNT
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (231 pts) 14.5 x 10,000 145,000.00
Internal Structure (Standard): 75 x 400 x 1 (+) 30,000.00 = 175,000.00
Myomer (Triple-Strength): 75 x 16,000 (+) 1,200,000.00 = 1,375,000.00
Engine (XL): (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 7,375,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 8,275,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,475,000.00
Life Support: 50,000 (+) 50,000.00 = 8,525,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 8,675,000.00
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 8,765,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 8,799,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 8,852,000.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,852,000.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Hatchet 5 x 5,000 (+) 25,000.00 = 325,000.00
Jump Jets 75 x (4 x 4) x 200 (+) 240,000.00 = 565,000.00
Large Laser 100,000 (+) 100,000.00 = 665,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 840,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 900,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 960,000.00
Small Laser 11,250 (+) 11,250.00 = 971,250.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 971,250.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,852,000.00
Weapons and Equipment Cost: (+) 971,250.00 = 9,823,250.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 17,190,687.50
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 17,190,688.00
|