Cost Breakdown
Name/Model: Black Knight (Black Six)
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (206 pts) 11.5 x 20,000 230,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 350,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 500,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,000,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,200,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,400,000.00
Life Support: 50,000 (+) 50,000.00 = 9,450,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,600,000.00
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 9,678,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 9,712,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 9,765,000.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,765,000.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
Large Laser 100,000 (+) 100,000.00 = 180,000.00
Large Laser 100,000 (+) 100,000.00 = 280,000.00
Large Laser 100,000 (+) 100,000.00 = 380,000.00
PPC 200,000 (+) 200,000.00 = 580,000.00
PPC 200,000 (+) 200,000.00 = 780,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 780,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,765,000.00
Weapons and Equipment Cost: (+) 780,000.00 = 10,545,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 18,453,750.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,453,750.00
|