Cost Breakdown
Name/Model: Griffin GRF-2NX
Technology: Inner Sphere (Mixed)
Tonnage: 55
Configuration: Biped BattleMech
============================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (185 pts) 10.5 x 20,000 210,000.00
Internal Structure (Standard): 55 x 400 x 1 (+) 22,000.00 = 232,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 342,000.00
Engine (Fusion): (5,000 x 275 x 55) / 75 (+) 1,008,333.33 = 1,350,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,250,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,450,333.33
Life Support: 50,000 (+) 50,000.00 = 2,500,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 2,610,333.33
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 2,676,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 2,701,633.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 2,740,133.33
----------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,740,133.33
============================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 575,000.00
Streak SRM 6 (C) 120,000 (+) 120,000.00 = 695,000.00
Streak SRM 6 (C) 120,000 (+) 120,000.00 = 815,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] (C) 0 (+) 0.00 = 815,000.00
----------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 815,000.00
============================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,740,133.33
Weapons and Equipment Cost: (+) 815,000.00 = 3,555,133.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 5,510,456.67
----------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 5,510,457.00
|