Cost Breakdown
Name/Model: Assassin IIC PRIME
Technology: Clan
Tonnage: 40
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (124 pts) 6.5 x 20,000 130,000.00
Internal Structure (Endo Steel): 40 x 1,600 x 1 (+) 64,000.00 = 194,000.00
Myomer (Standard): 40 x 2,000 (+) 80,000.00 = 274,000.00
Engine (XL): (20,000 x 280 x 40) / 75 (+) 2,986,666.67 = 3,260,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 4,160,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,360,666.67
Life Support: 50,000 (+) 50,000.00 = 4,410,666.67
Sensors: 40 x 2,000 (+) 80,000.00 = 4,490,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 4,550,666.67
Arm Actuators: 40 x ((100 x 2) + (50 x 2) + (80 x 1)) (+) 15,200.00 = 4,565,866.67
Leg Actuators: 40 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 28,000.00 = 4,593,866.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,593,866.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
ER Small Laser 11,250 (+) 11,250.00 = 83,750.00
LB 20-X AC 600,000 (+) 600,000.00 = 683,750.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 683,750.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 683,750.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 683,750.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 683,750.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 683,750.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,593,866.67
Weapons and Equipment Cost: (+) 683,750.00 = 5,277,616.67
BattleMech Cost Multiplier: 1 + (40 / 100) (*) 1.40 = 7,388,663.33
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 7,388,663.00
|