Cost Breakdown
Name/Model: Stinger IIC 3
Technology: Clan (Mixed)
Tonnage: 20
Configuration: Biped BattleMech
==========================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (67 pts) 3.5 x 20,000 70,000.00
Internal Structure (Endo Steel): 20 x 1,600 x 1 (+) 32,000.00 = 102,000.00
Myomer (Standard): 20 x 2,000 (+) 40,000.00 = 142,000.00
Engine (XL): (20,000 x 160 x 20) / 75 (+) 853,333.33 = 995,333.33
Gyro (XL): 1.0 x 750,000 (+) 750,000.00 = 1,745,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 1,920,333.33
Life Support: 50,000 (+) 50,000.00 = 1,970,333.33
Sensors: 20 x 2,000 (+) 40,000.00 = 2,010,333.33
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,070,333.33
Arm Actuators: 20 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 9,200.00 = 2,079,533.33
Leg Actuators: 20 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 14,000.00 = 2,093,533.33
--------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,093,533.33
==========================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------
Active Probe 200,000 200,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 210,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 220,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 220,000.00
CASE 2 x 50,000 (+) 100,000.00 = 320,000.00
ECM Suite 200,000 (+) 200,000.00 = 520,000.00
ER Small Laser 11,250 (+) 11,250.00 = 531,250.00
Improved Heavy Medium Laser 150,000 (+) 150,000.00 = 681,250.00
Jump Jets 20 x (8 x 8) x 200 (+) 256,000.00 = 937,250.00
--------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 937,250.00
==========================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,093,533.33
Weapons and Equipment Cost: (+) 937,250.00 = 3,030,783.33
BattleMech Cost Multiplier: 1 + (20 / 100) (*) 1.20 = 3,636,940.00
--------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 3,636,940.00
|