Cost Breakdown
Name/Model: Wild Weasel Light Tank (ER Variant)
Technology: Inner Sphere
Tonnage: 25
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (89 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 125,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 140,000.00
Engine (Fusion) (5,000 x 150 x 25) / 75 (+) 250,000.00 = 390,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 394,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 396,500.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 396,500.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 200,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 396,500.00
Weapons and Equipment Cost (+) 200,000.00 = 596,500.00
Combat Vehicle Cost Multiplier 1 + (25 / 100) (*) 1.25 = 745,625.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 745,625.00
|